EN 13231-3-2012 铁路应用-跟踪验收工作-第3部分:接受重新安排铁路的轨道

[复制链接]
查看5055 | 回复5 | 2012-1-4 13:35 | 显示全部楼层 |阅读模式
标准号:EN 13231-3-2012
实施状态:现行
中文名称:铁路应用-跟踪验收工作-第3部分:接受重新安排铁路的轨道
英文名称:Railway applications - Track - Acceptance of works - Part 3: Acceptance of reprofiling rails in track
发布日期:2012-01-01
代替标准:EN 13231-3-2006
采用标准:DIN EN 13231-3-2012,IDT;BS EN 13231-3-2012,IDT;NF F58-500-3-2012,IDT;SN EN 13231-3-2012,IDT;OENORM EN 13231-3-2012,IDT;PN-EN 13231-3-2012,IDT;SS-EN 13231-3-2012,IDT;UNE-EN 13231-3-2013,IDT;TS EN 13231-1-2013,IDT;UNI EN 13231-3:2012-2012,IDT;STN EN 13231-3-2012,IDT;CSN EN 13231-3-2012,IDT;DS/EN 13231-3-2012,IDT;NEN-EN 13231-3:2012 en-2012,IDT;SFS-EN 13231-3-2014,IDT;SFS-EN 13231-3:en-2012,IDT
标准简介:This European Standard specifies the technical requirements and the measurements to be made for the acceptance of work to reprofile longitudinally and/or transversely the heads of railway rails. For acceptance purposes, two classes of longitudinal profile and three classes of transverse profile tolerance are defined. Annexes describe procedures to verify reference instruments to be used for these measurements as well as methods to approve non-reference instruments to be used for measurements.This European Standard applies to reprofiled vignole railway rails 46 kg/m and above. It does not apply to acoustic rail reprofiling. A form of acceptance documentation that may be used is given in Annex E.
文件格式:PDF
文件大小:1.41MB
文件页数:44
(以上信息更新时间为:2019-11-28)

EN 13231-3-2012 铁路应用-跟踪验收工作-第3部分_接受重新安排铁路的轨道.pdf (1.41 MB)

使用道具 举报